Code Academy improvement project

Engitech LLC, Code Academy has undertaken to improve its IT infrastructure and create a perfect technological system and has implemented professional solutions in this direction.

Project Objective:The main goal of the project was to create stable power supply, an efficient security system, and innovative technological solutions for Code Academy's IT infrastructure.

Proposed Solutions

The following works were carried out within the project:

Planning and Laying of Cable Lines: The infrastructure's internal cable lines (Cat cable) were planned and laid to excellent standards.

Creating a CCTV Network:The network for CCTV equipment has been installed and put into operation.

Wireless Network System:The wireless network system has been installed and is ready for use.

CCTV System Installation:Security cameras have been professionally installed and the system has been configured.

Power Supply (UPS):Installation of a UPS system for uninterrupted power supply of IT equipment.

Firewall:Firewall equipment has been installed to ensure the information security of the region and the necessary rules have been implemented.

Conclusion

Code Academy has achieved significant innovations in terms of energy supply and safety within the framework of this project, having an innovative IT infrastructure. As Engitech LLC, we are proud to create value with a professional approach and effective solutions.

  • AZCD Group

  • COP29 – Baku

  • Baku Bus

  • Southern Gas Corridor

  • Cengiz Holding

Code Academy improvement project

Engitech LLC, Code Academy has undertaken to improve its IT infrastructure and create a perfect technological system and has implemented professional solutions in this direction.

Project Objective:The main goal of the project was to create stable power supply, an efficient security system, and innovative technological solutions for Code Academy's IT infrastructure.

Proposed Solutions

The following works were carried out within the project:

Planning and Laying of Cable Lines: The infrastructure's internal cable lines (Cat cable) were planned and laid to excellent standards.

Creating a CCTV Network:The network for CCTV equipment has been installed and put into operation.

Wireless Network System:The wireless network system has been installed and is ready for use.

CCTV System Installation:Security cameras have been professionally installed and the system has been configured.

Power Supply (UPS):Installation of a UPS system for uninterrupted power supply of IT equipment.

Firewall:Firewall equipment has been installed to ensure the information security of the region and the necessary rules have been implemented.

Conclusion

Code Academy has achieved significant innovations in terms of energy supply and safety within the framework of this project, having an innovative IT infrastructure. As Engitech LLC, we are proud to create value with a professional approach and effective solutions.